A typical component of waste management is the storing or stockpiling of waste materials for recycling or reuse. The Environment Protection Authority (EPA) requires that this action is carried out in the correct manner to ensure the probability of damage to human health and the environment is eliminated or reduced. Storage or stockpiling will have to be taken on exclusively in appropriate circumstances for genuine and favorable purposes.
Stockpile sites are used to enable the short term storage of material or tools for construction or maintenance projects. The kinds of components which may be put away are:
Select substance and fill – like sand and rock
Topsoil, wood chips, mulch and waste vegetation
Virgin Excavated Natural Material (VENM) and spoil
Recycled asphalt pavement (RAP) – rotomilled material
Concrete or asphalt block material taken from pavements
Aggregate and Pre-coated aggregate
Cold mix asphalt
Road base
Parked machinery and vehicles
Construction materials such as Jersey Kerb and traffic signs
General materials such as timber, steel etc.